The team have now completed the topsoil reinstatement adjacent to the valve house along with the rebuild of the existing dry-stone wall.
The team are halfway through the installation of spillway slabs and are currently excavating and removing blocks for the 4th slab to be installed.
Installation of the drainage pipework continues in readiness for the chamber construction.